CASE STUDY

Bicester Tesco

Permanent store footprint with car park and service yard, separate compound works

The background

Permanent store footprint with car park, service yard and separate compound works.

The result

Superb load bearing, an average 24200kN/m² was achieved.
Approximately 30% less cost than traditional methods.

  • Reduction of wagon movements 78% 78%
  • Reduction in imported aggregate 80% 80%
  • Reduction in carbon emissions 82% 82%