CASE STUDY

Kettering to Corby line improvement

Temporary works for contractor use on Network Rail line improvement

 

The result

Approximately 30% less cost than traditional methods, 70% CBR achieved.

  • Reduction of wagon movements 98% 98%
  • Reduction in imported aggregate 90% 90%
  • Reduction in waste to landfill 100% 100%
Kettering to Corby case study
Kettering to Corby case study

Do you have a project you wish to discuss?

3 + 11 =

Share This