CASE STUDY

Project Sapphire

Building, peripherals and multi deck car park, capping and sub base replacement

 

The background

Building, peripherals and multi deck car park. Capping and sub base replacement.

The result

Superb load bearing, an average 237,850kN/m² was achieved. Approximately 30% less cost than traditional methods.

  • Reduction of wagon movements 88% 88%
  • Reduction in imported aggregate 80% 80%
  • Reduction in export/disposal 100% 100%