A327 SHINFIELD BYPASS

Permanent works

 

The background

Ground improvment as part of bypass roadworks, temporary access installed as a separate project.

The challenge

Fully compliant +15% CBR working in accordance with SHW 600 series/IAN 74-07 and producing a stablised 9B material.

The result

Supberb load bearing and an average 170,280kn/m² was achieved.

  • Reduction of wagon movements 99% 99%
  • Reduction in imported aggregate 100% 100%
  • Reduction in Exported Material 100% 100%