Temporary haul roads and compounds

One pass system creating capping and sub-base to IAN 73/06 in half the programme time of traditional and other stabilisation methods, with the ability to return crop growth on completion.

Standard Stone design

Standard surfacing design

100mm of primary Type 1 stone is spread onto the curing stabilised material and is compacted, consequently this cures with the stabilised layer giving a robust, virtually maintenance-free and very durable surface. This is suitable for short to medium length programmes.

Armoured layer design

Armoured surfacing design

Primary Type 1 stone is laid over the stabilised layer, then mixed with GEOBIND® 2 to provide an armoured surface, which is completely maintenance-free and with a design life of at least two years. Warranties are available for this surface finish.

Temporary applications case studies

Do you have a project you wish to discuss?

14 + 5 =

Share This